Τετάρτη 25 Φεβρουαρίου 2015

First actual day of works

The basic crew arrived along with Mr. Diamantopoulos  (head architect)

We finished unistaling fidges and equipment. Extra care has been taken since most  are going to be refited.

arrival of crews

dismounting water cooling system
dismantling the bar (saving the timber)

water sports store room (restrooms to be)


The preparation of ACRM is evident

this blog also gives me the oportunity to cover some winter maintnace works


cleaning the coil of the washing machine boiler
washing machine boiler


main kitchen chemical treat


main kitchen chemical treat


Main store room deep freeze renovation (part of a three fridge renovation)


All three fridges (to be renovated)


Fridges motors (to be renovated)



The sign i hand painted as a kid  some 25 years ago now  memorabilia in my office