Σάββατο 28 Φεβρουαρίου 2015

Day Four


Bobcat clearing what to become  fountain / entrance


Bobcat clearing what to become  fountain / entrance


Bringing down the toilet wall


This will become the new kitchen. A new wall will be build and on the outside & parallel to the colums the cocktail bar will be formed.



Beach restrooms progress


Beach restrooms progress (nursery)


Structural check


 Structural check











Παρασκευή 27 Φεβρουαρίου 2015

Day 3


Early start. All machinery  arrived this morning


Demolishing old installations 


Clearing old lines





Making way to the new kitchen 


Opening holes for trees 



Restrooms 














Πέμπτη 26 Φεβρουαρίου 2015

Second day of works



Fridges, sinks and preparation tables to be re-used 


Changing cabins & restrooms


These two cabins will feature a private shower. We have many visitors from Athens who continue their day after visiting our beach. Giving the the opportunity to leave the beach prepared for any occasion is a big plus.


Restrooms are taking shape


Dismantling the electric board and saving everything re-usable


Saving everything reusable


Meanwhile demolishion is taking place. This is the express bar to be.


This will become nursery space in the beach restrooms 


Digging plumbing lines 


Back in the winter renovation. Block B lobby restrooms plumbing.

Τετάρτη 25 Φεβρουαρίου 2015

First actual day of works

The basic crew arrived along with Mr. Diamantopoulos  (head architect)

We finished unistaling fidges and equipment. Extra care has been taken since most  are going to be refited.

arrival of crews

dismounting water cooling system
dismantling the bar (saving the timber)

water sports store room (restrooms to be)


The preparation of ACRM is evident

this blog also gives me the oportunity to cover some winter maintnace works


cleaning the coil of the washing machine boiler
washing machine boiler


main kitchen chemical treat


main kitchen chemical treat


Main store room deep freeze renovation (part of a three fridge renovation)


All three fridges (to be renovated)


Fridges motors (to be renovated)



The sign i hand painted as a kid  some 25 years ago now  memorabilia in my office