Τρίτη 31 Μαρτίου 2015

Day thirty


Beach volleyball progress 


Craftsmanship 


The sea weed problem needs to be addressed with appropriate machinery.
There is too much sand in this pack to be perished.




This is a first step of coastal engineering. Leveling all coast will stop deterioration from returning waves.



Ready for the flooring process


The kitchen is ready

Beach shop progress 


Coastal engineering (and beach widening)


Xpress bar progress 


Each corner a different shop


Longer days and good weather allow late work


Coastal works 


Wider beach 











Δευτέρα 30 Μαρτίου 2015

Day twenty nine

I

This picture underlinesthe problem we encouter with sea weed. This has to be addresed imiadetly 


Green area preparation. To be dedicated for regulars. 


Beach volley progress



Green area progress / detail


Green area progress / detail


Green area progress / detail


Green area progress / detail


Stone coated facade progrress / "garage details"


Stone coated facade progrress / Beach shop





Stone coated facade progrress / "garage details"


Working on clearing the sand / solutions /  ideas















Κυριακή 29 Μαρτίου 2015

Πέμπτη 26 Μαρτίου 2015

Day twenty six

Last night we encountered a severe rain storm. My agony for the rainwater channel was high.
The test event was a pass. 

True mudhouse today

Working on xpress bar ceiling 

Wooden facade structural reinforcement 

Plants and trees arriving

Beach volleyball progress 

Stone coated facade

Roof insulation progress

Kitchen detail


Xpress bar 


"Garage doors" tuning


Beach shop forming


Stone coating progress




 

Day twenty five


Restroom progress / nursery 


Roof insulation progress


Opening way for the new beach volleball court. Old space will be used for parasolls



New beach volley ball court.



xpress bar


Xpress bar (the branding is a suggestion not included in planning)